How to quote an apartment unit turn (and keep the margin)
What goes in a flooring turn quote, how to price it from cost and margin, and the approval and follow-up steps that keep the money.
By Derek Spohn · Last reviewed November 2026 · 7 min read
In this guide
- The short answer
- What goes in a turn quote
- Price from cost and margin, then check the market
- Price floor prep as a flat unit
- Give the installer a layout
- Quote fast
- Handle surprises before you do the work
- Get the approval in writing
- Follow up on the first quote
- Worked example: a 2-bed turn
- Common mistakes
- Checklist
- How Turn One handles this
The short answer
Price a turn from your real cost of material and labor plus the margin you need, then check it against the going rate. Get it back to the property manager within 24 hours, get approval in writing before anyone pulls carpet, and follow up on the quote even when they say they’ll call you. A lot of the money a turn loses is lost after the quote, through a missed layout, an unapproved add or a follow-up nobody made.
What goes in a turn quote
A typical carpet-and-vinyl turn has more lines than carpet and pad. Quote each one in the unit the trade sells it in: carpet and pad in square yards (SY), plank vinyl in square feet (SF), base in linear feet (LF).
- Carpet and pad for the bedrooms, living room, hallways and closets.
- Vinyl or LVP in the wet areas, usually the kitchen and baths.
- Base, unless the unit has wood baseboard.
- Transitions and metals at every doorway where two floors meet.
- Labor for each material.
- Floor prep, as its own line (more on that below).
- Moving appliances or furniture, only as a separate fee. Moving a fridge or furniture left behind is a liability, so either exclude it in writing or charge for it.
Write down what’s excluded, too. “Price assumes an empty unit and a sound subfloor” heads off half the arguments before they start.
Price from cost and margin, then check the market
There’s no magic per-unit number. Build the price up:
- Material cost, with waste. Carpet comes off a 12 ft roll, so the yardage you buy is more than the yardage on the floor.
- Labor cost, in the same units your installers are paid in.
- Prep, sundries and anything else you’ll actually spend.
- Divide the total by one minus your target margin. For a 40% margin, divide cost by 0.60.
Margin and markup aren’t the same thing. A 40% margin is a 67% markup on cost. Quoting “cost plus 40%” gets you a 28.6% margin, which is a different business.
Then look at the number the way the property manager will. In our shop, pricing was always a balancing act between the margin we needed and what we knew other shops were charging. If you’re well over the going rate, you won’t get the work. If you’re well under it, ask what you missed.
Price floor prep as a flat unit
Prep is the hardest line to quote, because you can’t see it until the old floor is up. Old tack strip, glue that has to be scraped, a high spot that needs grinding: it’s all guesswork from the doorway.
What worked for us was a flat prep charge, with one “prep” roughly equal to an hour of work. The quote carries a flat prep line. If the installer finds more, they report how many preps the unit really took. That turns a vague overrun into a number you can show a property manager.
Give the installer a layout
The biggest way our quotes lost money was bad communication on the job.
An installer would call to say they were short on carpet. When we checked the unit, they hadn’t followed the layout, or never had one. Done the way we’d planned it, the material would have been enough. The planned layout uses the roll best, even when it isn’t the easiest cut. Other times an installer tore out an area that wasn’t in the quote.
Either way you cut extra material. Sometimes you can add it to the bill, but often you can’t, especially when you’re trying to win a new account. That cost comes straight out of your margin. So every turn should go out with a layout or cut sheet and a clear note of which rooms are in the scope.
Quote fast
We tried to get every quote back within 24 hours, and the faster ones won more work. If we already had the unit’s measurements on file, we’d often turn it around the same day.
Many apartment communities have a handful of floor plans, so you’ll quote the same unit types again and again. Keep each plan’s measurements and your last price for it, and a repeat quote takes minutes instead of a site visit.
Handle surprises before you do the work
Damaged subfloor, extra demo, underlayment the quote didn’t cover. When the installer finds one, the chain should be short and quick:
- The installer tells the install manager, with photos.
- If it’s over a set dollar amount, the install manager relays it to the sales rep.
- The sales rep sends the property manager the price and the photos and asks for a yes.
- The extra work waits for that yes.
Photos make the yes much easier. And if a risk is likely, such as an old building with a known subfloor problem, put an allowance for it in the quote up front.
Get the approval in writing
Property managers often approve a quote with a quick “looks good” by text, by email or on the phone. Some send a purchase order (PO), some don’t. If they use POs, don’t start without one. If they don’t, save the text or email that says yes, with the date, against the quote. If the yes comes by phone, text the property manager to confirm it and save that.
This matters because work done without approval often doesn’t get paid. You eat it completely.
The same goes for the end of the job. We tried signed forms and having installers stop at the office when they finished. Some did and some didn’t, and paper work orders got dirty, lost or torn before they made it back. A dated photo of the finished unit, saved to the job, is harder to lose.
Follow up on the first quote
This is where a lot of new business dies. You send a good quote, and the property manager says it looks fine, but this month’s turns are already handled and they’ll call you next month. Then they’re juggling many vendors, next month arrives, and they call their usual guy because it’s easier.
When you hear “I’ll call you,” put a reminder on the calendar for two to three weeks out. Then call them first.
Worked example: a 2-bed turn
All numbers here are an example. A 2-bed, 2-bath unit gets new carpet and pad in the bedrooms, living room and hall, and LVP in the kitchen and baths.
Your costs:
- Carpet, 63 LF off a 12 ft roll, which is 84 SY with waste included, at $9.50 per SY: $798.00
- Pad, 80 SY at $3.00 per SY: $240.00
- LVP, 160 SF with waste included, at $2.40 per SF: $384.00
- Base, 90 LF at $0.90 per LF: $81.00
- Transitions and metals, 4 at $12.00: $48.00
- Carpet and pad labor, 80 SY at $6.00 per SY: $480.00
- LVP labor, 160 SF at $1.75 per SF: $280.00
- Base labor, 90 LF at $0.75 per LF: $67.50
- Floor prep, 1 at $45.00: $45.00
Total cost: $2,423.50.
At a 40% margin, the price is $2,423.50 divided by 0.60, about $4,040. But this property has been paying around $3,700 for this floor plan, so you quote $3,700. Gross profit is $3,700.00 minus $2,423.50, or $1,276.50, a 34.5% margin. That’s the balancing act.
Now the job goes sideways. The installer skips the layout and comes up 12 SY short, which is 9 more LF off the roll. That’s 12 times $9.50, or $114.00, of carpet, plus a return trip that costs you about $90.00 in labor. Then the unit takes three preps instead of one, and nobody asked for approval on the extra two, so you can’t bill them. At $45.00 of cost each, that’s another $90.00.
Gross profit falls to $1,276.50 minus $114.00, minus $90.00, minus $90.00, which is $982.50. On $3,700, that’s a 26.6% margin. The price never changed. Eight points of margin went out the door after the quote.
Common mistakes
- Pricing from a per-unit number you’ve never checked against your costs.
- Confusing margin with markup.
- Leaving prep, transitions or the hallway off the quote.
- Sending a crew without a layout or a clear scope.
- Starting work on a verbal yes.
- Not following up after “I’ll call you next month.”
Checklist
- Every line is in the trade’s unit: SY, SF or LF.
- Material includes waste, and labor matches what you pay installers.
- Price is built from cost and margin, then checked against the going rate.
- Prep is a flat line, with a plan for extra preps.
- Exclusions are written down.
- The quote goes back within 24 hours.
- The crew has a layout and the scope.
- Approval is in writing, with the PO if the property uses them.
- A follow-up is on the calendar for every “I’ll call you.”
How Turn One handles this
In Turn One, a quote shows carpet in SY, plank in SF and base in LF, with the roll math done for you, and every quote shows its cost, gross profit and margin before it goes out. Each unit keeps its measurements and history, so a repeat quote takes a click, and the approved quote, with its PO, becomes the job. More on the Quoting page.
Derek Spohn built a multifamily flooring company from scratch to more than 20 crews. He started Turn One. Questions or a correction? Email contact@getturnone.com.
More guides
- How to invoice a property management company (and get paid sooner)What property management AP needs on every flooring invoice, where to send it, and how to follow up without souring the account.8 min read
- Margin vs. markup for flooring contractorsThe difference between margin and markup on a flooring job, how to convert one to the other, and why mixing them up costs you money.2 min read
- Outgrowing QuickBooks and spreadsheets: a switching plan for a flooring shopSigns your flooring shop has outgrown QuickBooks and spreadsheets, what moves to new software, when to cut over, and a switching checklist.7 min read
- Square yards, square feet and linear feet: how flooring is measured and soldHow carpet, LVP and base are sold by square yard, square foot and linear foot, how to convert, and how roll width and cartons set what you order.7 min read